Thanks for the reply TD2K. The water flow rate for both sides (venturi and tower) are about 15gpm (although they change it b/w 10-20gpm all the time). This is an estimate, but 30-35000cfm of air enters the scrubber at 60-80 deg Celsius. I was hoping to do something to the venturi side (adding a...
I want to lower the scrubber water temperature in a venturi and packed tower from 40C to 25C. What low-operating-cost solutions are there?
I'm new to the forum, thanks in advance.
Danny.