  1. jgailla

    CS Energy Ltd Callide C4. The coverup continues after RTS at vast cost with no insurance

    That's sad, zeus. Conspiracy theories and other lunacy were never allowed by either Pat. That forum is a cesspool now.
  2. jgailla

    HDD Water Mains - Should Designer Specify Joint Restraints?

    Why are you not using fused HDPE for the HDD portion?
  3. jgailla

    Army corps of engineers permitting and time for placing a stream in a box culvert

    Probably 6 to 18 months, depending on NEPA and how simple the project is.
  4. jgailla

    Need more $$$, thinking about changing careers or doing side work.

    Adult toys can be fairly inexpensive. They just go through a lot of batteries.
  5. jgailla

    Where to invest time as an EIT

    When I was right out of school, I worked for a company that was paying me a 40 hour salary and working me 70 hours a week. They billed the clients for all 70 hours.
  6. jgailla

    The Tale of Two Datums

    I had a site contractor friend who didn't know about the NAVD88 vs. NGVD29 conversion. She built a site and then tried to tie into a road, coming in about 1.5 feet off. There was a lot to tear out and regrade to get everything to work. The problem is tying in outside the project.
  7. jgailla

    Tectum Decking Dates?

    My experience with assessing multiple military buildings of various ages indicates popularity of Tectum from 1950s through 1970s, probably highest in early 70s. I don't recall seeing its use after 1980. Sample size of maybe 2000 buildings built from 1950s through 2010s.
  8. jgailla

    Good Calculator/Spreadsheet for Determining if road gutter runoff will blow past a catchbasin

    FHWA has procedures for bypass flow. https://www.fhwa.dot.gov/engineering/hydraulics/pubs/10009/10009.pdf
  9. jgailla

    ASTM C150 vs. C595 cement

    I recently learned that the largest cement manufacturer in my state (Florida) is now producing only C595 cement. This has been coming for a while, but only in the past six months has it become an issue. Has there been any discussion of this on this thread? I don't recall seeing it. What, if...
  10. jgailla

    Portable Building near Potential Pool Fire area

    You're being redundant, MJ. No adjective is needed.
  11. jgailla

    PEMB foundation design fees

    Also, who is the EOR? PEMB engineers generally will not be the EOR. If you're the only other engineer on the project, the client will likely be looking to you for this. You'll also assume responsibility for delegated design of the PEMB.
  12. jgailla

    FFE above pond Elevation

    Yes, you should be at least 1 foot above your 100-year pond elevation. In some circumstances you should be higher than that. It depends on the outfall and surrounding topography.
  13. jgailla

    Road Crown and Finished Floor Elevation Next to Wetland?

    It's not a code and it is very dependent on your location and hydrology. The way I read your situation, the road needs to be at 11 to stay up our of the groundwater. I assumed that your FFE would need to be higher based on drainage patterns. Local codes are different. Your particular...
  14. jgailla

    Road Crown and Finished Floor Elevation Next to Wetland?

    If the wetland is at EL 9, then seasonal high groundwater is at EL 9 or above. You need your base and subbase up out of the seasonal high. The road should be at EL 11 unless there is other information. I would have an FFE at minimum EL 12, 3 feet above the wetland elevation.
  15. jgailla

    Minimum Fall Across Compacted Hardstand

    If you don't have 2% minimum you will get puddles.
  16. jgailla

    Classifying Drafters vs Designers

    I'm in civil engineering. There are designers, drafters, and tracers. Designers will take a concept like a swale or pipe network and produce plans with a minimum of questions and review. Designers have significant worth but in my experience are very rare. Drafters will need to have...
  17. jgailla

    Schedule 80 for underground fire protection supply - outside of the building

    I work in the southeast US and I can't recall thrust blocks being allowed by any utility.
  18. jgailla

    Is additional Tie Reinforcement required in concrete pedestal cross section?

    How are the rodbusters going to place the vertical rebar without the tie?
  19. jgailla

    #12 screws can drill through 1/4" thick steel plate?

    From personal experience, you can get self drilling screws through a 1/4" plate. I used to do construction labor for cold formed and red steel. It takes patience and slow use of a drill to get it through without burning out and melting the tip. I would never specify the use. You will get a...
  20. jgailla

    Filter thickness of a earthen dam

    18 inches for a horizontal drain and 36 inches for a vertical drain. The vertical drain can end up with discontinuities if it is too narrow.