  1. singingk

    Compaction Perm

    See: 95 modified proctor posted by Lozano in earthwork/grading engineering in February
  2. singingk

    Compaction Perm

    Your right, it's just try and error, and sometimes it's a challenge for lab tech's patience to match such requirements (for example to prepare a sample for direct shear tests). But with your approach (given soil mass and moisture content) I think it should not take more than five trials to find...
  3. singingk

    Should CPT shear values be supported by testing?

    "More specifically, though, for critical structures, do you feel direct shear or triaxial tests are necessary to check the CPT correlations, or do you think the CPT plus index tests is adequate for design of such facilities?" If you get a budget for intensive testing, take it and improve your...
  4. singingk

    Should CPT shear values be supported by testing?

    Both the interpretation and the deriving of soil poperties from CPT-data are highly empiriclly based business. I would never give any geotechnical recomendation for buildings as mentioned in your post without getting the soil in my hands and doing some basic testing. If I know - the soils which...
  5. singingk

    question on mounding analysis

    According to german jurisdictions ex-(I would prefer to say in-, but I'm not a native speaker) it is neccesarry to keep a distance between the bed of the ex- (in-) filtrations and the maximum groundwater level of minimum 1 m (approx. 3 1/3 ft.) to prevent any possible groundwater contamination...
  6. singingk

    Shoring Requirmenets for Building Excavation

    What are the results of the borings concerning the ground? You posted 'bout some soft strata above..
  7. singingk

    Shoring Requirmenets for Building Excavation

    You have to give more informations about the ground and groundwater situation before anybody can give you further advice.
  8. singingk

    detention basin

    addition to cvg... There are even detention and infiltration bassins without any overflow, planned without any doubt about the hydraulic and geotechnical assumptions made for planning...
  9. singingk

    Static Cyclic K Values

    If you are looking for earth pressure coefficients k (active/passive) you'll find tables and/or diagrams in nearly every geotechnical textbook. I' sure one of the USACE puplication includes this data.
  10. singingk

    Falling-Head Perm Setup Question

    What kind of soil did you try to test? If sand samples are percolated from the upper side, it is neccessary to flood them from the bottom (with de-aired water) before testing. Therefor we put the sample in a bucket with an overflow above the upper side of the sample. Clean the hose carefully and...
  11. singingk

    CPT Data

    BigH: your collection of links to helpful e-literature is unbeliveable! I tried (and I still try) also to derive correlations between cpt-data and soil mechanics parameters, but in my expirience the reliability of the subsequent derived parameters is generally not sufficient. Some of the well...
  12. singingk

    Lateral Pressure on Retaining Walls from Gravel Backfill

    If fill (also gravel) is compacted behind a retaining wall, additional earth pressure resulting from the compaction shall be considered in geotechnical analysis. Have a look for the respective approaches.
  13. singingk

    slope stability checks

    Sometimes I still prefer chart-solutions for first estimations. Chart solution for slope stability analysis you may find here: http://www.usace.army.mil/publications/eng-manuals/em1110-2-1902/entire.pdf Be careful with simplified models disregarding the influence of seepage forces, slope...
  14. singingk

    English expression suitable for "Vorkopfbauweise"

    Thank you very much for your helpfull postings, special thanks to BigH for the nice sketch.
  15. singingk

    English expression suitable for "Vorkopfbauweise"

    BigH, thanks for your answer and the link, it's always usefull to have access to a broad range of literature. "Swamp shooting" and "rolling surcharge" was/is also used in Germany and I admited the terms to my private dictionary. But I'm sorry your proposal does not match the procedure I tried to...
  16. singingk

    English expression suitable for "Vorkopfbauweise"

    I' m searchin for an english expression, which designates the following way of embankment construction on soft soils called "Vorkopfbauweise" in german: the embankment is built by placing the fill on the soft soil at the end of the part of the embankment which has been built before. "Towards the...
  17. singingk

    Unit Costs EU/Spain

    Hello BigInch, you can get a first impression about unit costs for such works in Germany using this book: Martin Mittag: Ausschreibungshilfe Außenanlagen und Tiefbau. Standardleistungsbeschreibungen. It#s availabele by Amazon.
  18. singingk

    Detecting sand filler and clay

    Hello, in Germany poorly graded sands with a silt and clay content below 5% wt. are classified according to DIN 18196 as "Sand, enggestuft" abbreviation "SE". Maybe this was mentioned here.
  19. singingk

    10 m High Embankment on Soft Clay+Stone Columns

    In germany stone columns were sometimes used for ground improvement in soft soils with an undrained shear strength down to 15 kPa. Approved methods for the design of embankments founded on stone columns are given by Heinz Priebe (settlement and slope stability). The Method for estimating (!) the...
  20. singingk

    Compaction of highly plastic soil

    It depends on the consistency of the soil, for soft soils (Ic = 0,5-0,75 according to german designations) and sometimes also for stiff soils (Ic = 0,75-1 s. above)we use the proctor device. Which dimensions has the sample an which tests shall be performed?