  1. longbow7

    How much heat is injected into well

    The pressures are gauge.This application is a SAGD injection and I think that we need to desuperheat the steam before injecting.We can't bring the pressure too low but at this rate we are not getting much heat.
  2. longbow7

    How much heat is injected into well

    If you put steam in an injection well at 1550 kPa at 202C and it returns at 1000 kPa at 183C how much heat has been left in the well?
  3. longbow7

    Hydro testing a steam line

    We have a frozen vent line containing steam vapour operating at about 15 psig.I wouuld like to add a drain valve that has to be a new fitting.It is the casing gas line off of an oil well. Do I need to hydro the whole line due to the addition of this new drain line.The drain will drain to...
  4. longbow7

    Boiler/pressure vessel confined space entry training

    Try looking at something like this for a start. http://brady.norcattraining.com/courses.htm
  5. longbow7

    Boiler Warmup

    I agree with what you say .I would prefer to leave the lines open and bring the boiler up at a drum metal rate of 100 f /hour.This is what I have always done in the past. Some of the people at my new position say they never did this and instead just turned off the gas when pressure climbed too...
  6. longbow7

    Boiler Warmup

    I have worked many years on drum watertube boilers with superheaters.We always started a boiler with the superheater drains and vents open.The drum vent was initially open and then closed at about 25psig.I now work with a boiler that does not have a superheater..We start it with the drum vent...
  7. longbow7

    Boiler warm up

    I have worked many years on drum watertube boilers with superheaters.We always started a boiler with the superheater drains and vents open.The drum vent was initially open and then closed at about 25psig.I now work with a boiler that does not have a superheater..We start it with the drum vent...
  8. longbow7

    New boiler boil out

    I have the procedure from the boiler supplier but I wanted to compare with another source.
  9. longbow7

    New boiler boil out

    Where can I find a procedure for boiling out a new D: type watertube boiler 220,000 # per hr 10,000 usg volume
  10. longbow7

    Oil in feedwater

    Water tube D type 220,000 # per hour gas fired.Not yet fired but wishing to prevent any problems.What test is most reliable to predict/prevent oil from entering feedwater?
  11. longbow7

    Oil in feedwater

    Do you have to take the boiler down to flush it or do you just have to keep blowing it down until oil has been removed?Is there treatment that can be added quickly to prevent fouling of the tubes?
  12. longbow7

    oilfield steam generator sagd

    What is the reccomended cooling rate for a once through steam generator used in the sagd oilfield process?