Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. haghanian

    Debris in Sewers

    The line is already in place and its velocity is significantly less than 2 feet per second. This effect is increased by the change in slope since all the debris coming down the steep slope accumulates right there.
  2. haghanian

    Sewer flow deposits

    Does anyone know of a simple formula to be used for estimating debris deposits in a gravity sewer? I'm concerned about a specific location where there is a change in slope from a very steep slope to a mild slope. I have values for seddimentation in the same line upstream of this point (this...
  3. haghanian

    Debris in Sewers

    Is there any basic formula to use to estimate debris deposits in a sewer? I'm concerned about a location where there is a change in slope from a very steep slope to a mild slope. I have values for seddimentation in the same line (with a different slope) at an upstream location.
  4. haghanian

    UBC Guardrail Requirement

    UBC states that a guardrail is required on roofs "used for other than service of the building". Since service of the building is vague, is anyone aware of a definition for facilities used for the service of a building?
  5. haghanian

    Amusement Water Rides

    Has anybody had experience designing water rides for amusement parks? I am in the process of designing a wastewater pump station with an "ogee" ramp (for those who are familiar with this), and thought that some feedback from water rides would be helpful. The main focus is...

Part and Inventory Search