haghanian
Civil/Environmental
- Jan 12, 2002
- 5
Is there any basic formula to use to estimate debris deposits in a sewer? I'm concerned about a location where there is a change in slope from a very steep slope to a mild slope. I have values for seddimentation in the same line (with a different slope) at an upstream location.