shockstressed (Structural) 7 Mar 06 10:28
corrected error
Old lake ?
it sounds as if the base sediments were weak and somebody failed to assess the geotechnical works prior to in a thorough manner or somebody did not want to accept the site had gone permanently due to soak, and degradation, or...
Old lake ?
it sounds as if the base sediments were weak and somebody failed to assess the geotechnical works prior to in a thorough manner or somebody did not want to accept the site had gone permanently due to soak, and degradation, or nobody would pay what would have been a small cost compared...
The input then is for the maximum load to be encountered and worse, after that you can sleep at night instead of seeing walls slipping down hills in a mudwash with odd lorries floating after it. Yes
Inadequate seems to be agreed with by the fact that most of the local Motorway slopes are being removed under contract
and the sites cleared back to prevent such load calculations being effective, that from many slips encountered.
If the contractor knows you have placed a design that might incur...
A QUOTATION FROM THE PRESENT
University Research:
Basal stress on the inverted pyramid Design
January 1967 1982 2005
_ Many supported by the Few _
2006
THIS IS A CONSEQUENCE OF 39 YEARS SLOG AND NOTING...
ANOTHER OPTION IS TO RETAIN THE BALANCE OF THE SLOPE AND USE A REINFORCED STRUCTURE OF SOILS THAT ALLOWS THE EXCHANGES OF LOW FLOW DURING HIGH FLOOD AND HAS THUS TO BE OF ADEQUATE PERMEABLE STATE TO TAKE THE FLOW WITHOUT STRESS IN THE STRUCTURE THROUGH FINE MATERIALS CAUSING A SURGE EFFECT AND...