As it has been pointed out above it is
not a good practice and should be entirely avoided .
I would suggest a re-location of the bathroom elsewhere.
@#@#@#@
[b]srbu[b]
To reinforce what has been said above by other contributors, i would first and foremost want
you to view the situation as an oppotunity to
go thru. (and probably)learn from the design
calculations of an experienced Engineer.
Secondly, i would not advise you to sign.
Instead discuss...
From what you have stated, there is no way that that slab would hold. So the best option is to break the span of the slab to reduce the mid-span moments.
Incorporate UB(Universal Beam)steel section to run below the roof slab along the shorter span to break the 9m span edge into two-halves. The...
i agree with redtrumpet about the client having an independent and qualified consultant who would do all the background checks and follow up.
It's unfortunate that the other company had to reduce themselves to badmouthing. Such practice should be penalised in the profession as it is against the...