Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. structeng13

    Force Transfer Around Openings

    Thanks for the response!! Just one more question, This is assuming that there is a diaphram below, in the case where the doors are on the first floor with the concrete foundation below, would you still apply the same methodology you describe in the last post? This has been asked a few times...
  2. structeng13

    Force Transfer Around Openings

    I have checked all the previous threads regarding the force transfer around openings approach that is specified in the the CBC2007 and I still have one question. Can this approach be used if the opening is a door rather than a window, assuming that holdowns are located only at the ends of the...
  3. structeng13

    ACI 318 Appendix D, Anchorage for Simpson Strong walls

    Thanks for the responses! I did check out the new ESR report and I will definitely take into consideration designing a 'fuse' that will not require the 2.5 multiplication factor of the factored loads
  4. structeng13

    ACI 318 Appendix D, Anchorage for Simpson Strong walls

    After looking into more, it appears that the use of a headed bolt will be required because the ESR report for the SSTB28 isn't updated to the IBC2006 yet. But my question still remains regarding the use of simpson strongwalls if people have calculated using the SSTB anchor bolts.
  5. structeng13

    ACI 318 Appendix D, Anchorage for Simpson Strong walls

    Hello, I have been reading all the threads that I can regarding the ACI 318 Appendix D and the calculation for anchor bolt capacity placed in concrete. I just recently performed a calculation based on a Simpson shearwall that is SW18x9 and is resisting a relatively minor ASD load of 420 lb...
  6. structeng13

    ACI 318 Appendix D, anchorage for Simpson Shearwalls

    Hello, I have been reading all the threads that I can regarding the ACI 318 Appendix D and the calculation for anchor bolt capacity placed in concrete. I just recently performed a calculation based on a Simpson shearwall that is SW18x9 and is resisting a relatively minor ASD load of 420 lb...
  7. structeng13

    Sliding Resistance Problems

    For some reason I could only see one pic and it was pretty blurry, it looked like a pretty steep slope. My client found somebody else that would put the six foot wall in for him with the slope of 1:1.
  8. structeng13

    Sliding Resistance Problems

    Thanks for the recommendations GeoPaveTraffic! That is pretty much the only conclusion that I could come to as well. Increase the wall height and decrease the slope behind it. As for the width that you were worried about. I think we got confused. I was using a 2' width assuming no geogrid...
  9. structeng13

    Sliding Resistance Problems

    BigH, The wall and footing will be on level ground, but the slope is already predetermined because it is existing. At this point I believe that a geotech will have to visit the site for an analysis of the existing slope and soil. How much would this cost the client?
  10. structeng13

    Sliding Resistance Problems

    Well, actually there is only one retaining wall that will be 6.6' high, this wall has a slope behind it of 1:1 for a distance of 10' where the property line screen fence is. At this point, the ground levels out. Setbacks are not an issue I believe because the client previously had a 3'...
  11. structeng13

    Sliding Resistance Problems

    Sorry for the confusion, the 150psf has to do with the Table 18-I-A in the CBC which shows the maximum allowable lateral bearing of a footing. In the case of a class 4 soil it happens to be 150 psf/ft below the natural ground surface, as far as the active earth pressure acting on the wall, I...
  12. structeng13

    Sliding Resistance Problems

    A client has asked for a retaining wall to be designed in his backyard which has an existing slope. The proposed wall will only be six feet high, CMU, with a concrete footing. The slope that will be behind the wall is at 1:1. Without a soils report I am assuming a class 4 soil from the CBC...
  13. structeng13

    Basic EE stuff

    The electrician was sitting on it for a while, so I thought I could create the schedule quickly. I guess I will just leave it for him. thanks!
  14. structeng13

    Basic EE stuff

    I am trying to put a panel schedule together, but I have never done it before. It is for a pool building that has some pumps for the pool and spa. I saw an example of another one that shows equivalent load on the A and B phase, my question is whether this is required for 240 Volt application...
  15. structeng13

    Condo Open Air Envelope

    Thanks for the info. As a follow up question about the fact that the building itself is a duplex. Assuming that it was not a part of an association, what steps would be necessary to the city to open up the building envelope for construction? Thanks!
  16. structeng13

    Condo Open Air Envelope

    I recently had a client ask me if I could provide assistance with turning his condo duplex into a townhome because he wanted to add another story to the building. He mentioned that a process called a condo open air envelope would have to be initiated, but I have never heard of this. Has...
Back
Top