Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MirBG
  • Order by date
  1. MirBG

    Partial saturated flow

    Hi Lubocjw, I have the same mechanica-hydraulic coupling problem. In the end, have you found a solution? How you have resolved this problem? Thanks
  2. MirBG

    Infiltration in partial saturated soils

    I have already tried with the way you suggest with a perfect elastic material and the job, even if very slowly and with many warnings due to plasticity divergence,has been completed with reasonable results.
  3. MirBG

    Infiltration in partial saturated soils

    Hi.I'm simulating the evolution of the saturation index in an embankment after its consolidation(done in a situation of fixed saturation at 0.5 and pore pressure at -1000kPa).The job aborts during the step in which I deactivate the boundary condition of -1000KPa, I create a condition of zero...
  4. MirBG

    Changing property material

    I have a little problem.I need to change the permeability of my job material during the last step, but I don't know how to do. Can I use the model change options or is there another way? Thanks for the advice.
  5. MirBG

    Assembling two soil parts

    Hi Hamadadf, I've solve the problem! Thanks for your help!
  6. MirBG

    Assembling two soil parts

    Ok. I build the embankment and the soil bedrock in a single part and I divide them with a partition. I introduce the initial conditions of the geostatic state editing the keywords , but after this step I haven't well understood if I must activate gravity in different geostatic steps. Haven't I...
  7. MirBG

    Assembling two soil parts

    I have tried to solve my consolidation problem, considering two different ways: first I have used an orphan mesh of the entire embankment and divided it in many pieces, activating gravity of them in different steps. In the second way, I considered the embankment divided in many parts and...
  8. MirBG

    Assembling two soil parts

    Hi all, I need a help for my consolidation problem. I don't know how to assembly two different parts of soil, because my job finishes with an error of overconstrains, using penalty friction. Could you suggest any possible solution?
  9. MirBG

    Problems during results visualization

    Probably this isn't the solution because I've only one istance in my model. I've tried to change some options in the visualization step, but I couldn't find the right one to solve the problem. Isn't there another way?
  10. MirBG

    Problems during results visualization

    I'm working on a coupled pore fluid- stress consolidation but I have problems in the visualization of the results. After I complete the job an error message appears during visualization: Deformation and/or analytical surface extent is too large as compared with the model. Could you suggest me a...
  11. MirBG

    Solver problem.Zero pivot...

    I've tried to use rigid body in my model and the job has been finally completed, but I cannot visualise strains and deformation results that I need. I think this solution cannot be used in a cam-clay model. What can I do to solve the problem in another way?
  12. MirBG

    Solver problem.Zero pivot...

    Thanks a lot. I'll try to solve the problem.
  13. MirBG

    Solver problem.Zero pivot...

    Hi all, I have a problem with coupled pore fluid pressure/stress analysis during the simulation of the construction of an embankment, in particular using the clay plasticity model. Could you suggest me a solution? The warnings message is: ***WARNING: THE SYSTEM MATRIX HAS 562 NEGATIVE...
Back
Top