I had posted this in a different forum (piping and fluid mechanics) with no replies. I think it may be better suited in this forum?
________
A few questions for the group. Thanks for any time you may be able to spend on them.
I have a piping system that was designed and registered using ASA...
A few questions for the group. Thanks for any time you may be able to spend on them.
I have a piping system that was designed and registered using ASA B31.3, with Chemico design specifications. The service conditions are:
-10" Sch40S A358 TP304 c/w TP316 300# flanges
~25000scfm NOx
-510C...
I had posted this question in another forum, but maybe this is the best location for the question (with some added history).
__________
I am digging up some information on a proposed repair to fix leaks on one of our waste heat boilers, and am wondering what procedure and filler metal should be...