Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. PipelineTZM

    Developing and Working with other Engineers

    Just get that job Dave. I feel 1 year experience is good enough. All you need is having confidence in yourself and the things you'll be doing. If at anytime you're stuck just come here here and post your problems. I've seen guys here post their daily assignments and I wouldn't doubt that they...
  2. PipelineTZM

    Thinking Like an Engineer

    This is just a case of serious 'self-doubt'. The only thing you need is someone telling you that you have done a good job. But with a Masters in AE (specialization), pats on the back don't come that easy. Just continue reading those engineering books! Engineering is always like that. You'll...
  3. PipelineTZM

    Tank Gauging System - is the SCM63 Compatibile with the Auxitrol FP740

    Hi All, I am looking for an Auxitrol Portable Terminal (PT 740) for configuring an Auxitrol Level Transimitter (FP 740). I have tried to locate some suppliers and unfortunately these items are not being manufactured anymore. However, I came across one (1) supplier who said he had a used module...
  4. PipelineTZM

    7-day vs. 28-day compressive strength tests

    msucog, bigh I get your concerns. But I still believe that the strength of concrete at 28-day will never be less than the 7-day and if the 7-day is greater than the designed or required strength then the 28-day results will just satisfy your curiosity on the maximum strength attainable by that...
  5. PipelineTZM

    7-day vs. 28-day compressive strength tests

    zambo is right. there is no need to go all the way to do the 28th day test when the 7th day strenth is greater than the 28th. its just an extra cost to the client for the over designed mix (consider the cement content. i say 7 day is ok if greater than the specified 28 day strength.
  6. PipelineTZM

    Min. & Max. velocity flow for sewer pipes

    The mostly used minimum self-cleaning velocity for sewer lines is 0.76m/s (metric)

Part and Inventory Search

Back
Top