Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. asaini

    Feed Dual Supply Servers from Two UPSs

    Thanks everyone for your valuable input and timely help!
  2. asaini

    Feed Dual Supply Servers from Two UPSs

    I’m designing a UPS system for treatment plant critical loads that includes: PLCs, SCADA servers, control panels, and some instrumentation. I have been asked by the owner to provide two separate UPSs to feed the dual supply servers from two separate panels. Do you have any suggestion on...
  3. asaini

    Is this a NEC violation?

    I am designing a Pump control panel; and I have 208/120V power available near this site. The loads are: 1, 2HP Pump (to be fed by 1Ph, 208V) 4, 1/2 HP Pumps (to be fed by 1Ph, 120V) 1, UPS for control power -750VA @ 120V Control Panel Light, Blower, and an Outlet. I’m planning to bring a 1PH...
  4. asaini

    California Title 24 compliance

    alehman & EEJaime Thanks for your responses! This canopy will be installed in a water treatment plant and sole purpose is to cover the chemical tank, and resemble with the gas station canopy.
  5. asaini

    California Title 24 compliance

    I’m working on lighting design of a canopy (22’ X 42’) for chemical storage tank. I’m providing 4 lighting fixtures and my questions is; do I need to fill the title 24 forms? if yes do they need to be on the drawings or can they be as an appendix to the specs.

Part and Inventory Search