I’m designing a UPS system for treatment plant critical loads that includes: PLCs, SCADA servers, control panels, and some instrumentation.
I have been asked by the owner to provide two separate UPSs to feed the dual supply servers from two separate panels.
Do you have any suggestion on...
I am designing a Pump control panel; and I have 208/120V power available near this site.
The loads are:
1, 2HP Pump (to be fed by 1Ph, 208V)
4, 1/2 HP Pumps (to be fed by 1Ph, 120V)
1, UPS for control power -750VA @ 120V
Control Panel Light, Blower, and an Outlet.
I’m planning to bring a 1PH...
alehman & EEJaime Thanks for your responses!
This canopy will be installed in a water treatment plant and sole purpose is to cover the chemical tank, and resemble with the gas station canopy.
I’m working on lighting design of a canopy (22’ X 42’) for chemical storage tank. I’m providing 4 lighting fixtures and my questions is; do I need to fill the title 24 forms? if yes do they need to be on the drawings or can they be as an appendix to the specs.