  1. EEL23

    Bare Tube Evaporator/Prime Surface Evaporator

    Thanks itsmoked!!! No it is not student question. That is I'm really going to make for a client. ==================================== Vertical Milk Cooling ( 500L of Milk from 20 to 4'C) The time to cool milk in Milk Cooling Tank is 150 minutes. Inner Shell Diameter = 250 mm ; Thick of Shell...
  2. EEL23

    Bare Tube Evaporator/Prime Surface Evaporator

    Hi.... I am working on two projects but struck with Evaporator Length. Needed help to go through that ones. 1. I need to Cool 3,000 Liter of Water from 35'C to 15'C but immersing Cooper Coil into Water. R 134A will be used as refrigerant. 2. 2mm thickness,500L SS 304 Tank that contains milk and...
  3. EEL23

    Sequence of opening of anti-surge valves

    Thanks for your interest. We have a synthesis gas compressor which has three casings i.e. LPC (low pressure casing), IPC (intermediate pressure casing) and HPC (high pressure casing). LPC casing has 8 impellers/stages and then gas from LPC goes to cooler and then to K.O. drum, it enters into...
  4. EEL23

    Sequence of opening of anti-surge valves

    I need to know about what should be the sequence of opening of anit-surge valves, when unloading the centrifugal compressor have multiple casing with intercooler and K.O. drums.