Thanks a lot, gbam. Thing is, I have to send my surveyors out to topo the creek, so I need to know the limits before I do any analysis. I've seen a few things referenced, such as, "at least to a point above the 500-year flood elevation", etc., and, "500 feet upstream and downstream", but these...