HI Every one
thanks in advance, I want to have more information on string test of rotating machine like gas compressor and gas turbine generator
is it mandatory to do it
salutations
Djamel
Dear All
Our manual valves supplier response to authority comments about missing PT report for some manual valves
that PT for items 1 to 7 and 12 to 15 with ASTM A105N / ASTM A216-WCBIt is not applicable, the PT Test is only applicable for ASTM A-694 F60 material – ítems 8 to 11.
5 PENETRANT...
HELLO
JUST I WANT TO KNOW IF IT IS NECESSARY TO MENTION ON ISO DRAWINGS THE OPERATION AND DESIGN CONDITIONS
OR TO REFER JUST THE LINE LIST PIPING
PLEASE COULD SOMEONE CLARIFY TO ME THE SITUATION
SALUTATIONS
GHAZI
Hello
I have the below question could anyone advise me
Current Scope : Refer to P&ID no. DZ-HBR-01-WSX-PRO-PID-0001 Typical Wellhead, 2" chemical injection designed by using heavy thickness 316SS pipe and special flanged ends valve high rating 10,000 psi
Propose to proceed: Redesign by...
Dear Bcd (Mechanical)
Thank you for your reply now you put me on the right way
90% of the end connection diameter will be used tor calculation of the minimum wall thickness required by ASME 16.34
but the manufacturer have to calculate the real thickness according to real parameters of...
HI EVERY ONE
i have some difficulties to understand good how to calculate the thickness of reduced bore ball valve example 6''X 4'' class 600 RB used asme B16.34 article 6.1.2
6.1.2 Inside Diameter. For the purpose of determining ð17Þ wall thickness, tm, using Table 3A or Table 3B, or the...
Bonjour
See the attached the sheared bolt photos
Regards
DGhttp://files.engineering.com/getfile.aspx?folder=b0b3f137-e94b-4484-9844-bec7228712de&file=IMG-20180228-WA0000.jpg
Good Afternoon
Thank you for all
The plant is under the epccs contractor and the vendor is coming after tomorrow in aim to do the investigation.
The contractor team replaced the broken all bolts of those GTG and both are in operation.
My intention of the post of this problem is someone met a...
Bonjour
In the new gas treatment plant located in Algeria (JV), the first gaz was exported in the mid of December 2017) , two weeks ago from now , during the operation of the Solar turbine Generator it was happened a serious problem for two machines (09 MW by machine), that was the...
bonjour
Thank you for all
just i want to share the real installation of the the exact location of the joint, it is located at the exit of our metering station before the buried pipeline on a distance
of 130 meters to tie in connection (see the schema below)
according to my installation if...
HELLO EVERYONE
I am facing problem to choose between the monolithic joint (Joint Assemblies) and Insulating Flanges
we have a metering station to be connected to a pipeline buried we would to choose one of them to be installed above ground before the buried pipeline
could some one give me...
HI EVERYONE
I would like to have some feed back about on the galvanised bolts in the underground flanges of GRE , for firefighting network new project, directly buried and in contact with soil )may be subject to corrosion or not.
I am just to see the necessity to protect these bolts by some...
I am engineering responsible for new project gas traitment plant located in Algeria we are looking to get some experience back of hgsiev UOP technology because in Algeria we don't have this technology used
is there anyone can share his experience about the following hgsiev UOP technology used...