We are executing a project requiring the replacement of stop logs at the water intakes. What is a suitable replacement(= to or greater than) creosote lumber? Creosote was specified in the engineering but has a 4 mo. turnaround which is not feasible for our schedule.
Hey Eddycurrentguy, The line spec. calls for DSAW, pipe, API 5L, API 5L Gr. B PSL 1, BE Normalized, pre-paint This is a cooling water service, 120 degrees F , 42 PSIG