  1. archeratslt

    RSTRENG MYTHOLOGY FOR PIPELINE DEFECT ASSESSMENT

    Very interesting discussion, Thanks to all, Dear 09091960, Do you mind to share the output (KP, depht, length, WT, ...) from IP with us? I am working on something and need it badly. Thanks in advance,
  2. archeratslt

    3 hour storm duration

    I think maybe based on observations, One sea state (or storm) normally takes between 3 to 6 hours,
  3. archeratslt

    Subsea Pipeline Detail Fatigue Analysis - Force Model

    I think you can calculate the stresses based on Leff. which is the length of the pipe with simiar behaviour but for fix-fix (or pin-pin i can't remember)
  4. archeratslt

    3 hour storm duration

    DNV says 3 to 6 hours. but it discusses 3 hours as a general case. if you expect duration more than that you should use your value instead of 3 hrs.
  5. archeratslt

    Pipeline external pressure

    For external pressure design we need to know maximum difference between external and internal pressure. So, the phenomena such as Tide, Wave, and storme surge should be considered for calculating the external pressure. For internal pressure the minimum pressure the the condition of interest...