I am designing a small timber post and lagging wall. The structure is holding back 5.5 ft of sandy silt with groundwater estimated at 2 ft below ground surface behind the wall. Ground surface at the toe of the wall decreases at a 5:1 slope; ground surface behind the wall is flat. I am...