wds1
Structural
- Mar 22, 2004
- 29
I have a situation where we need to dig a 15' Deep trench for a 10' dia. x 60' long water tank. The trench only needs to be open for about 1 day. OSHA requires us to shore the trench or layer it back. Is there an easy and cost effective solution shoring the trench. The solution can bend, but it cannot break. Assume 1. We cannot layer back the slopes, 2. We have no room to tieback the top. Any suggestions? Thank you.