Hello all,
The project is in tender stage. Client is asking for a 100mm cladding, which will be supported on Cip beams top and bottom on each floor. I am afraid about Demoulding the panel which can be solved by using a tilting table. Embeds like Halfen channel might not be possible as the panel thickness is small.
What problems(design,connections, production, demoulding, transportation and erection) I might be facing if I keep the panel thickness 100 mm ? Please suggest.
The project is in tender stage. Client is asking for a 100mm cladding, which will be supported on Cip beams top and bottom on each floor. I am afraid about Demoulding the panel which can be solved by using a tilting table. Embeds like Halfen channel might not be possible as the panel thickness is small.
What problems(design,connections, production, demoulding, transportation and erection) I might be facing if I keep the panel thickness 100 mm ? Please suggest.