dozer
Structural
- Apr 9, 2001
- 503
In section 1612.3.1 of UBC '97 one of the load combinations is 0.9D +- E/1.4 and it states specifically that no increase in allowable shall be used except for some mumbo jumbo in section 1809.2 that applies to soil. The next section, 1612.3.2 "Alternate basic load combinations" also includeds 0.9D +- E/1.4. This section says, "When using these alternate basic load combinations, a one-third increase shall be permitted in allowable stresses for all combinations including W or E."
So my reading of this is that if I use the alternate basic load combinations I can use a one-third increase in allowables for the 0.9D +- E/1.4 combo but if I use section 1612.3.1 I cannot use it for this same combo.
Is anybody confused besides me? Can anybody explain this?
So my reading of this is that if I use the alternate basic load combinations I can use a one-third increase in allowables for the 0.9D +- E/1.4 combo but if I use section 1612.3.1 I cannot use it for this same combo.
Is anybody confused besides me? Can anybody explain this?