KoolTemp
Mechanical
- Sep 5, 2012
- 8
I have a very interesting case concerning a 2 pipe system. The owner wants to transition from heating in the morning (boilers heating the supply water up to 120F) to coiling in the afternoon (chillers supplying 45F water). With this being a 2 pipe system I need to dump all the BTU's in the water medium (huge energy waste, but this is what the owner is set on) to a low enough temp where the chillers don't blow their refrigerant. On top of this there is a very tight time constraint of 1/2hr-1hr. There is only (1) small MUA available and this doesn't have near the capacity to get ride of this heat. There is also a pool but it is already tempered. A heat exchanger for the DHW was considered but by the time the heat dump is needed the peak demand hours are far from over for the DHW. The systems worst case gpm is 1125 gpm.
Any suggestions on how to control/dump the heat/ or make this system work properly? Any ideas at all?
Any suggestions on how to control/dump the heat/ or make this system work properly? Any ideas at all?