fasboater
Structural
- Jan 3, 2007
- 73
I am trying to wrap my arms around this. I am just trying to get a broad over view of the design method. For example this is how I believe it works.
1) SDS SD1
2) Building period
3) Seismic base shear
4) Later force @each story
5) ?
6) ?
I am just trying to make sure I have the procedure correct. Could someone give me a boot in the correct direction?
Thanks for the help..