kelvin
Electrical
- Nov 11, 1999
- 7
Does any one know of any economic method of linking and teeing off 22kV cable above ground similar to 11kV systems such as HOLEC, Elastimold. I am looking at the prospect of installing cable instead of O/H line in some rural built up areas but research to date indicates that costs are still to high to justify the change. Interested in anyone experiences in this subject