Supun93
Structural
- Nov 28, 2019
- 35
I have a 2 ft cantilever floor in my ADU. How can i transfer shear loads from that cantilever wall to ground floor shear wall. We have a 2 ft overset. Thanks
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.