teobusetti
Structural
- Apr 26, 2014
- 4
Hi,
Does anyone know how I can apply a total load of 75 N in steps of 12.5 N on a node of a cable net system in a time period of 120s (so 12.5 N every 20s)?
I have managed to apply the total final load of 75 N but I cannot find a way of dividing the load into steps.
I am new to ABAQUS so it would be very appreciated if you explain in a bit of detail how to do it
I have attached a photo of the previous results I got: I am trying to make the ABAQUS analysis (blue dots) to match the Experimental Data (grey dots).
Thank you!!
Matteo
Does anyone know how I can apply a total load of 75 N in steps of 12.5 N on a node of a cable net system in a time period of 120s (so 12.5 N every 20s)?
I have managed to apply the total final load of 75 N but I cannot find a way of dividing the load into steps.
I am new to ABAQUS so it would be very appreciated if you explain in a bit of detail how to do it
I have attached a photo of the previous results I got: I am trying to make the ABAQUS analysis (blue dots) to match the Experimental Data (grey dots).
Thank you!!
Matteo