mannyzuniega
Structural
- Dec 25, 2005
- 2
Hi there,
Offshore pile design requires 3points of zero deflections in order to satisfy the pile penetration requirement. DO you have any references codes/standards/studies regarding this?
Thanks
Offshore pile design requires 3points of zero deflections in order to satisfy the pile penetration requirement. DO you have any references codes/standards/studies regarding this?
Thanks