What are most people seeing the contractor do when this type floor is specified ?
How close do you need the chairs to hold mesh this light of mesh in place. 12" ? Does anyone allow the contractor to walk in mesh or pull up mesh ? How can the contractor get the chairs in place in an enclosed building (he can't pump from over head or pour from the sides) with a lazer screed and concrete trucks on the grade ?
 
Replies continue below

Recommended for you

jike,
The best way of keeping the cracks at the top surface tight is to keep them tight where they originate, which is at the bottom. I know this is not the majority thinking, but to me and the rest of the minority it is logical. The best paper I have seen on the subject is "A Structural Look at Slabs on Grade" by Cesar Kiamco, published in the July 1997 issue of the Concrete International magazine.
 