SFIENG
Mechanical
- Dec 27, 2002
- 2
First a little back ground information. In production (pipe spools to B31.3) I will be using SA-333 GR 6 (P1/G1) / A350 GR LF2 (P1/G2) / SA-420 GR WPL6 (P1/G2) which will be supplied impact tested to -50F. I am looking to limit the number of PQRs so for the procedure testing I am looking to join SA-516 GR 60 (P1/G1) to SA-516 GR 70 (P1/G2) to qualify the procedure to weld the stated production materials.
I was wondering if anyone would share any welding parameters for welding P1 G1/G2 materials to pass CVNs at -50F per B31.3. I will be performing PQR's in GTAW and FCAW on 1/4" and 1/2" material in the 3G position. I am using ER70S-2 with 100% Argon in the GTAW process and E81T1-Ni1 with 75%Ar/25%CO2 in the FCAW process.
I know that low heat input is critical for the CVN testing. Can anyone offer their experiences on maximum heat input (J/in.) for successful CVN at -50F?
I was wondering if anyone would share any welding parameters for welding P1 G1/G2 materials to pass CVNs at -50F per B31.3. I will be performing PQR's in GTAW and FCAW on 1/4" and 1/2" material in the 3G position. I am using ER70S-2 with 100% Argon in the GTAW process and E81T1-Ni1 with 75%Ar/25%CO2 in the FCAW process.
I know that low heat input is critical for the CVN testing. Can anyone offer their experiences on maximum heat input (J/in.) for successful CVN at -50F?