Shakta
Geotechnical
- Dec 22, 2015
- 25
Subsurface encountered a very dense sand layer about 20' below ground level. Instead of predrilling and using PSC section, a composite pile with 20' PSC section and 40' HP section was recommended. Wondering if anyone have this kind of pile driving situation. What kind of challenges may show up during construction/ pile driving. Thanks in advance for your input.