hm5k
Civil/Environmental
- Oct 6, 2007
- 15
On drawing at column splice connection weld represent as partial penetration weld with single bevel groove with 75%.
please advice, do we need to provide column flange preparation up to 75% thickness of total flange thickness. e.g. W12x40 have 1/2" thick flange so we need to provide 3/8" prep (75% of 1/2") to flange so 1/8" will be root face in that case.