Bear with me...this is a bit long: Litigation is over. Settlement received.
Contacted in 2007. Case settled in 2011. Remediation started in 2012.
Initial task was to evaluate potential water intrusion and deterioration of a 15-building, condominium facility in Northeast Florida, USA.
Background:
15 Buildings
Each building had between 18 and 22 units. (300 Units, total)
Buildings were constructed with wood framing, OSB exterior sheathing, and stucco facade.
Constructed in 4 phases by two separate general contractors. Many of the subcontractors were the same though different general contractors for the phases. GC # 1 only built the first three buildings. GC #2 built remainder of the buildings.
Manifestation of problems as complained by residents:
Water intrusion around windows
Mold growth
AC thermostats not responsive
Electric bills inconsistent
Initial investigation:
Visual assessment found improper window flashings (no head flashing, no appropriate sealant around windows...
Lots of cracking in stucco
Improper spacing of control joints in stucco
Coating problems with several buildings (alkali burn in coatings...obvious deterioration)
Improper termination of roof flashings
Improper sealing of roof flashing terminations and interface with stucco
Pavement problems
Drainage problems
Follow up investigation:
Destructive observation around windows revealed severe water intrusion and substrate deterioration
Found breaches of fire rated walls
Stucco was not installed in accordance with building code (and stucco system was not an approved system)
Flashings between roof and walls not properly done
No air infiltration barrier installed in Phase 1 (first 3 buildings)
Result of investigation and testing:
Found paper-backed lath was installed incorrectly resulting in water intrusion and deterioration of lath from water intrusion
Windows leaked
Stucco falling off wall from improper placement
Structural issues with ties between floor
Roof/wall flashing issues resulting in deterioration of substrate
Preliminary engineering opinion of cost of repair: $9.8 million
Bids received from contractors for repair: 9.7 to 10.4 million
Ultimate settlement: about 6 million
Currently in remediation of first 3 buildings. Remediation of first three buildings.....$1.2 million. (Phase 1 was in worse condition as compared to phases 1a, 2 and 3.)
4+ years of litigation
7 days of deposition for me
3 mediation attempts...3rd attempt successful for owners
Will post a few photos in subsequent posts....
Contacted in 2007. Case settled in 2011. Remediation started in 2012.
Initial task was to evaluate potential water intrusion and deterioration of a 15-building, condominium facility in Northeast Florida, USA.
Background:
15 Buildings
Each building had between 18 and 22 units. (300 Units, total)
Buildings were constructed with wood framing, OSB exterior sheathing, and stucco facade.
Constructed in 4 phases by two separate general contractors. Many of the subcontractors were the same though different general contractors for the phases. GC # 1 only built the first three buildings. GC #2 built remainder of the buildings.
Manifestation of problems as complained by residents:
Water intrusion around windows
Mold growth
AC thermostats not responsive
Electric bills inconsistent
Initial investigation:
Visual assessment found improper window flashings (no head flashing, no appropriate sealant around windows...
Lots of cracking in stucco
Improper spacing of control joints in stucco
Coating problems with several buildings (alkali burn in coatings...obvious deterioration)
Improper termination of roof flashings
Improper sealing of roof flashing terminations and interface with stucco
Pavement problems
Drainage problems
Follow up investigation:
Destructive observation around windows revealed severe water intrusion and substrate deterioration
Found breaches of fire rated walls
Stucco was not installed in accordance with building code (and stucco system was not an approved system)
Flashings between roof and walls not properly done
No air infiltration barrier installed in Phase 1 (first 3 buildings)
Result of investigation and testing:
Found paper-backed lath was installed incorrectly resulting in water intrusion and deterioration of lath from water intrusion
Windows leaked
Stucco falling off wall from improper placement
Structural issues with ties between floor
Roof/wall flashing issues resulting in deterioration of substrate
Preliminary engineering opinion of cost of repair: $9.8 million
Bids received from contractors for repair: 9.7 to 10.4 million
Ultimate settlement: about 6 million
Currently in remediation of first 3 buildings. Remediation of first three buildings.....$1.2 million. (Phase 1 was in worse condition as compared to phases 1a, 2 and 3.)
4+ years of litigation
7 days of deposition for me
3 mediation attempts...3rd attempt successful for owners
Will post a few photos in subsequent posts....