Hi everyone,
I'm a newbie so please keep the heckling lightweight until I find my feet.
I am working with a push-pull SMPS toroidal transformer design in the 20KW region. The transformer in question has ferrite rings threaded onto the primary and secondary transformer "tails". There are 6 on each primary and 4 on each secondary but on the secondary they are two obviously different types.
I think they are there to increase leakage inductance. What are they there for and how does this work ?
many thanks
Roger
I'm a newbie so please keep the heckling lightweight until I find my feet.
I am working with a push-pull SMPS toroidal transformer design in the 20KW region. The transformer in question has ferrite rings threaded onto the primary and secondary transformer "tails". There are 6 on each primary and 4 on each secondary but on the secondary they are two obviously different types.
I think they are there to increase leakage inductance. What are they there for and how does this work ?
many thanks
Roger