Right now I am working on a water tank installation in a A319 and I come across a problem.
For the installation, some pipes are installed and a support bracket is installed to the structure.
I can not find in the SRM or in the IPC how those items are called and if they are or not Fatigue Critical Baseline Structure.
From another drawing, that I can not show, they seem to be connected to the bulkhead floor but not to the structure floor.
Thank you so much for your help.
this is my first post and I am really happy to enjoy the community.
Right now I am working on a water tank installation in a A319 and I come across a problem.
For the installation, some pipes are installed and a support bracket is installed to the structure.
I can not find in the SRM or in the IPC how those items are called and if they are or not Fatigue Critical Baseline Structure.
From another drawing, that I can not show, they seem to be connected to the bulkhead floor but not to the structure floor.
Thank you so much for your help.