My concern is whether or not to preheat pipe before thermal cutting. As per API 582:
8 Preheating and Interpass Temperature
8.1 Preheating, where required, applies to all welding, tack
welding, and thermal cutting of ferritic steels except for thermal
cutting of P1 materials. Minimum preheat requirements
shall follow the applicable code such as ASME Section VIII,
Appendix R; ASME B31.3, Table 330.1.1; and AWS D1.1,
Annex XI. Any recommendations or requirements for preheat
listed in the relevant code shall be considered mandatory.
What are the possible dangers (metallurgy) of not preheating to code temperature before cutting?
Note: The cut pipe will eventually be welded and recieve PWHT as per B31.1
Thanks for your help!
Mike
8 Preheating and Interpass Temperature
8.1 Preheating, where required, applies to all welding, tack
welding, and thermal cutting of ferritic steels except for thermal
cutting of P1 materials. Minimum preheat requirements
shall follow the applicable code such as ASME Section VIII,
Appendix R; ASME B31.3, Table 330.1.1; and AWS D1.1,
Annex XI. Any recommendations or requirements for preheat
listed in the relevant code shall be considered mandatory.
What are the possible dangers (metallurgy) of not preheating to code temperature before cutting?
Note: The cut pipe will eventually be welded and recieve PWHT as per B31.1
Thanks for your help!
Mike