jetboat
Structural
- Jan 7, 2009
- 19
I am designing anchors embedded into a 2' square pier. The pier has eight vertical bars evenly spaced 3" from the perimeter. I consider the vertical bars as supplemental reinforcement and ignore the concrete breakout check for tension since it doesn't govern. I was wondering about the Ncbg value for concrete pryout in section D.6.3. Does anyone have guidance on weather or not using a larger value for Ncbg than D.5.2 guides? Due to supplemental bars I would assume that alarger value of Ncbg could be used.