macatc123
Mechanical
- Apr 27, 2011
- 9
Hi all, I am transferring many Solidworks files into our Workgroup PDM vault. We will be using the LifeCycle feature which will update the revision level of the document depending on what the status is (In Work, Released, etc.). Since I am checking in many documents that already have revisions, I am going to check them in and set the revisions to "Read from File" so that PDM will set the revisions to drawings current revision.
The problem, is that while all the drawings have revisions, the part files do not. I need a method of changing all of the revisions of the part files to match the revisions of their drawing file.
Perhaps there is a way in Task Scheduler?
Thanks for the help!
The problem, is that while all the drawings have revisions, the part files do not. I need a method of changing all of the revisions of the part files to match the revisions of their drawing file.
Perhaps there is a way in Task Scheduler?
Thanks for the help!