Bobfromoh
Mechanical
- Sep 9, 2002
- 157
I have a 10' diameter CS API 650 tank, flat bottom.
It's about 15 years old. Customer wants to put a 6"
studding pad (thru a vertical weld)located about 6" from
the bottom plate. There is no information on this type
of connection. Does it still need a repad added? Can it just
be welded in or should it be made part of an assembly?
Thanks,
It's about 15 years old. Customer wants to put a 6"
studding pad (thru a vertical weld)located about 6" from
the bottom plate. There is no information on this type
of connection. Does it still need a repad added? Can it just
be welded in or should it be made part of an assembly?
Thanks,