ctmecheng
Mechanical
- Mar 21, 2016
- 22
Hello All,
My Engineering Firm was just awarded a project to replace (2) existing nozzles with (4) new nozzles that are a size larger on a boiler steam drum. We are contracting out the engineering of the nozzles to a proper PE, and we are doing the piping design that will attach to the nozzles. I am a mechanical EIT, and I wanted to do some preliminary research on what is required to add new nozzles to the boiler. If someone could point me in the right direction that would be very helpful. I am sifting through Section VIII currently, assuming this is the correct place to start.
Thank you in advance.
My Engineering Firm was just awarded a project to replace (2) existing nozzles with (4) new nozzles that are a size larger on a boiler steam drum. We are contracting out the engineering of the nozzles to a proper PE, and we are doing the piping design that will attach to the nozzles. I am a mechanical EIT, and I wanted to do some preliminary research on what is required to add new nozzles to the boiler. If someone could point me in the right direction that would be very helpful. I am sifting through Section VIII currently, assuming this is the correct place to start.
Thank you in advance.