WWSME
Civil/Environmental
- Jul 5, 2012
- 9
I'm running a pipeline from blowers with a discharge pressure of 10 psig to an aerated cell roughly 30 ft away. I intend on using carbon steel pipe, but wondering about the schedule. Can schedule 10 CS piping be used?