Problem: Air entrainment spec. 5%-7%. Actual air entrainment 1.5%
Exterior footings for a one story wood framed building. Project located in midwest (freeze-thaw cycle is expected).
70 yards of concrete was placed. The field testing was done somewhere around the 50th yard. Late testing was done because of bad scheduling by the contractor. The field testing was done twice to verify.
The concrete has some air. Is this enough to do the job? Is there any research or other information that you can point me to to help evaluate this situation?
Exterior footings for a one story wood framed building. Project located in midwest (freeze-thaw cycle is expected).
70 yards of concrete was placed. The field testing was done somewhere around the 50th yard. Late testing was done because of bad scheduling by the contractor. The field testing was done twice to verify.
The concrete has some air. Is this enough to do the job? Is there any research or other information that you can point me to to help evaluate this situation?