CivilG
Civil/Environmental
- Apr 15, 2015
- 21
I am designing a new water distribution system for a new subdivision. The water lines are 6" and 8" diameter C-900. Due to the profile and grade breaks in the road profile, my water lines will have to follow the same profile with slight ups and downs as the grade changes. Question: Is it necessary to install an air relief valve at every high point in the water line, or can some small high points in the water line profile be ignored? Is there a rule of thumb that many engineers use? Thanks, Civil G.