Given that it takes 10 distillation trays to purify crude (or 40% purity)
oxygen into 95% oxygen at an air separation unit serving a chemical
complex. The customer (owner of chemical complex), however, requires
99.9999% purity oxygen to feed a new oxidizer reactor in a pilot R&D
facility.

A new purification column is considered for purifying a side-stream of the
crude oxygen, to meet the oxygen purity demand in pilot facility. How many
trays should be designed into the new purification column ? Assume that
the mass transfer efficiency per tray is constant (i.e. does not change
with composition and there is no pinch) and that tray gas-liquid flows will
be perfect.
 
Replies continue below

Recommended for you

Based upon the information you have given, if you assume that the tray efficiency is unchanged, the concentration of the impurities is multiplied by a factor of 0.78 across each tray. At high purity levels, I have no idea if the assumption is valid. If it is, you would need a total of 54 trays, or a second column with 44 trays in addition to your existing 10 tray column.

The math for the impurities is:

(0.6)*(0.78)^54 = 8.94*10^-7

Which gives a purity of:

1-8.94*10^-7 = 0.9999991
 
I want to ask about material of tray and thermosyphon type heat exchanger in bottom. 99.999% oxygen is likely to combust with aluminium metal. NASA has experienced that and lost lots of space pilots by implosion with oxygen and cloths made of aluminium.
In addition 99.999% oxygen means 1 ppm impurity. In air 50-100 ppm of hydrocarbons is normal. So it means that hydrocarbons accumulates in liquids in bottom when thermosyphon heat exchanger evaporates gas from liquids.
I am not sure of your process flow diagram. But you must change a lot and estimate cost & persuade customers.