Air Testing of roof is required as per the following clause in API 650:
F.4.4 When the entire tank is completed, it shall be filled with water to the top angle or the design liquid level, and the design internal air pressure shall be applied to the enclosed space above the water level and held for 15 minutes. The air pressure shall then be reduced to one-half the design pressure, and all welded joints above the liquid level shall be checked for leaks by means of a soap film, linseed oil, or another suitable material. Tank vents shall be tested during or after this test.
I have tanks with design pressure about 1.5 kPa(g). The contractor wants wants to fill the tank upto the apex of the cone roof and use a stand pipe and fill it to exert the required pressure.
API does not say that Air Test or a hydrotest may be used.
Can somebody advise me if hydrotest can be used to substitute Air Test?
F.4.4 When the entire tank is completed, it shall be filled with water to the top angle or the design liquid level, and the design internal air pressure shall be applied to the enclosed space above the water level and held for 15 minutes. The air pressure shall then be reduced to one-half the design pressure, and all welded joints above the liquid level shall be checked for leaks by means of a soap film, linseed oil, or another suitable material. Tank vents shall be tested during or after this test.
I have tanks with design pressure about 1.5 kPa(g). The contractor wants wants to fill the tank upto the apex of the cone roof and use a stand pipe and fill it to exert the required pressure.
API does not say that Air Test or a hydrotest may be used.
Can somebody advise me if hydrotest can be used to substitute Air Test?