Colfax
Mechanical
- Aug 4, 2015
- 22
I work for a crane manufacturer and the PE we work with and I are at odds over a recent project. The beam I selected for the project checks out with all the standards and he agrees. The problem is that the plot of the beams available moment vs. unbraced length stops at 24' in the AISC manual and the required length is 28'. He says that if the plot stops in the manual, the beam can't be used. Utilizing equations F1-1, F2-4, and F2-1 from the AISC manual, the available moment exceeds the required. The manual says the beam plots stop arbitrarily at a span to depth ration of 30 in most cases. My question is, which governs? Do the available moment vs unbraced length tables or the LTB equations? I am not trying to be disrespectful to the PE, I am just trying to get a better understanding of this.