YuJie_PV
Mechanical
- Jan 19, 2017
- 135
i am reading Interpretation "BPV VIII-1-19-11", and encounter a problem:
Background: A vessel has a 14" NPS nozzle which is 15mm (0.59") thick with a Category C butt weld between the nozzle neck and a flange. The nominal thickness at the welded joint does not exceed the thickness in UW-11(a)(2), the nozzle is not attached to the shell or heads of vessel covered under UW-11(a)(1),(2) or (3) and the pressure vessel does not fall under UHT.
Question 1: When the vessel is marked with RT-2, is full radiography required for the category C butt weld?
Reply 1: No
Question 2: If the answer to the Question 1 is "No", is spot radiography per UW-11(a)(5)(-b) required to satisfy the RT-2 marking?
Reply 2: No
it's easy for me to understand Quesiton 1, but why the reply is also "No" to Quesiton 2. the nozzle 14" NPS exceeds NPS 10" as specified in UW-11(a)(4), why spot radiography per UW-11(a)(5)(-b) not required?
thanks in advance
Background: A vessel has a 14" NPS nozzle which is 15mm (0.59") thick with a Category C butt weld between the nozzle neck and a flange. The nominal thickness at the welded joint does not exceed the thickness in UW-11(a)(2), the nozzle is not attached to the shell or heads of vessel covered under UW-11(a)(1),(2) or (3) and the pressure vessel does not fall under UHT.
Question 1: When the vessel is marked with RT-2, is full radiography required for the category C butt weld?
Reply 1: No
Question 2: If the answer to the Question 1 is "No", is spot radiography per UW-11(a)(5)(-b) required to satisfy the RT-2 marking?
Reply 2: No
it's easy for me to understand Quesiton 1, but why the reply is also "No" to Quesiton 2. the nozzle 14" NPS exceeds NPS 10" as specified in UW-11(a)(4), why spot radiography per UW-11(a)(5)(-b) not required?
thanks in advance