ars001
Structural
- Aug 21, 2006
- 83
I have a very large lateral load (111k service load) that I'm trying to transfer from my anchor bolts into a 30"x36" reinforced concrete pier. I've tried checking concrete breakout according to the ACI appendix D and don't seem to be getting anywhere near the capacity I need. I'm at crossroads on where to go from here. Is there any design guides untilizing my pier reinforcing? Thanks