strguy11
Structural
- Nov 29, 2005
- 232
I have a 6 story building located in Nashville, TN high seismic area. The building is is about 125'x 250'. I have analyzed the building in RAMm with 3 braced frames in the long direction, and 2 in the short. I am getting what seem to be extremely high uplift loads 1700 kips at the frame reactions. All of the frame member sizes seem right, so what I am wondering is has anyone else ever had these high of forces, and what type of anchor rod configuration did you use. It seems like I may be using 2.5" rods, but I have never had something with this high of uplift loads before.