bippedibopp
Petroleum
- Feb 13, 2008
- 4
Anyone!
We have designed some anode sleds and now we are looking to find the safest and most reliable method of installing the sleds to the subsea structures. The proposal currently on the table is a retrofit clamp to install when the system is already subsea. It seems pretty reliable, however, we would like to have an alternative method that can be installed onshore as we are in the position to install the clamps/connections before the structures go offshore. Does anyone know of any field proven methods other than the retrofit clamp i have already mentioned?
Regards
We have designed some anode sleds and now we are looking to find the safest and most reliable method of installing the sleds to the subsea structures. The proposal currently on the table is a retrofit clamp to install when the system is already subsea. It seems pretty reliable, however, we would like to have an alternative method that can be installed onshore as we are in the position to install the clamps/connections before the structures go offshore. Does anyone know of any field proven methods other than the retrofit clamp i have already mentioned?
Regards